Before signing, get four things in writing: what the base price includes, how and when option prices become binding, a milestone schedule from framing to possession, and the inspection and warranty procedures. Verify permit and inspection status through the City of Dublin's online portal rather than relying on sales-office estimates.



What Should You Ask Before Buying New Construction in Dublin?

Buying New Construction in Dublin comes down to four written answers: what the base price actually includes, how option and upgrade pricing works, what the real timeline looks like, and how inspections and warranty claims are handled.


The advertised list price is only a starting point, because the finished home you'll own depends on the builder's specifications, your selections, and the contract terms for that specific development. I walk my buyers through this checklist before they ever sit down in a sales office.


Key Takeaways

  • The City of Dublin says building-permit applications requiring plan review generally take about two to three weeks (10 to 15 business days), which is only the plan-review period and not the time it takes to build or close a home.

  • Builder terms for deposits, cancellation rights, delay remedies, design-center deadlines, and incentives are not uniform, so they must be verified in the purchase agreement, addenda, and option sheets for your specific development.

  • Compare homes by the completed specification on a written inclusion sheet, not by the advertised list price, since model homes often show upgrades that aren't in the base price.

  • Dublin's online permit portal lets applicants track permits and view inspection results, so you can ask the builder for permit numbers and verify milestones yourself.

  • Every option, price, and schedule change should be documented in a signed or contractually recognized writing and saved in a dated file.


How Do You Compare a New Home to Its List Price?

You compare it by the completed specification, not the sticker price. Ask for a written inclusion sheet for the exact lot and plan you're considering, then price every gap between that sheet and the home you actually want to live in.


I've seen buyers fall in love with a model home and later realize half of what impressed them was an upgrade. Model homes are staged to sell, and the features you walked past may not be in the advertised price.


What should the base-price inclusion sheet cover?

It should name what comes with the base price in each major category. Ask the builder to list:

  • Flooring, countertops, and cabinets

  • Appliances, lighting, and plumbing fixtures

  • Landscaping and fencing

  • Garage equipment and window coverings

  • Solar or electrical equipment and smart-home features


If a feature isn't on the sheet, assume it's an extra until the builder confirms otherwise in writing.


How are upgrade and option prices presented?

Upgrade pricing varies by builder, floor plan, phase, installation stage, materials, and whether the option is structural or cosmetic. I haven't found any authoritative local price schedule, and I wouldn't trust a general online estimate for one. Rely on the builder's dated design-center price sheet and your signed change orders.

When you get an option estimate, ask the builder to break out:

  • The option price itself

  • Credits for any standard feature you're replacing

  • Installation charges and design fees

  • Appliance allowances

  • Taxes or other pass-through charges

  • Any effect on financing


Then ask whether each option is refundable, transferable, or cancellable before installation. How much to budget for upgrades depends on your plan, your lot, and how many of the standard finishes you're willing to live with. That's a conversation I'd rather have with your actual option sheet in front of us.


Which choices have deadlines, and which can be changed later?

Structural options generally have the earliest deadlines because they affect plans and construction sequencing. Cosmetic selections like cabinets, flooring, and lighting may come later, but they can still become unavailable once materials are ordered. Ask the builder to sort every choice into three buckets:

  • Decisions due before framing or rough plumbing

  • Selections that can be made later

  • Items you could only change after installation through a separate alteration


How do change orders work?

Your contract should say who may approve changes, when a price becomes binding, how a change affects completion, and whether a buyer-requested change can delay closing. Every change belongs in a signed or otherwise contractually recognized writing. A verbal "we can do that" at the design center isn't a document.


How Long Will a New Dublin Home Really Take, and What Can You Verify?

The only firm local timing figure is the City of Dublin's plan-review estimate: the city says permit applications requiring plan review generally take about two to three weeks, or 10 to 15 business days. That is the review period for a permit, not a construction timeline. Inspections, corrections, utilities, subdivision work, and the builder's own schedule all add time.


So don't accept one "estimated completion" date. Ask for the schedule in milestones, and treat each one as something to confirm.

Milestone

What to ask the builder for

Why it matters

Framing and drywall

Target dates and how they're communicated

Sets up your pre-drywall inspection window

Buyer-selected options

Installation date for each option

Late or missed installs can push completion

Municipal inspections

Permit number and inspection status

You can confirm progress independently

Final inspection and certificate of occupancy

Anticipated final-approval date

Closing and possession depend on it

Closing and possession

Written dates and what happens if they slip

Affects your rate lock, lease, and move plans

How can you check permit and inspection status yourself?

Use the City of Dublin's portal. The Citizen Self-Service Portal lets applicants submit permit materials, track applications, schedule inspections, and view inspection results. Ask the builder for the applicable permit number and project or subdivision name so you know what to look for.


The city also notes that online inspections can generally be scheduled until 5:00 a.m. on the day of inspection, and that the permit, inspection record card, and required energy forms must be available to the inspector. That tells you inspections are a managed, trackable process, so vague answers from a sales rep are a yellow flag.


Do your options change the permit or energy paperwork?

They can. Dublin requires permits for most construction and repair work, including electrical, plumbing, and mechanical work. If you're adding electrical capacity, altering plumbing, upgrading lighting, or changing HVAC, ask whether the option is covered by the original permit and plans.


Also ask whether your selection requires revised energy documentation. The city's residential plan-submittal materials refer to signed Title 24 energy reports where applicable, so it's fair to ask if an option affects the home's final approval.


What happens if the builder misses the completion date?

That depends entirely on your purchase agreement. No authoritative source sets a single rule for construction-delay remedies in Dublin, so I read each builder's contract for delay language, extension rights, and what you can do if the date moves. If you're coordinating a rate lock or a sale of your current home, this clause deserves extra attention. My move-up buyer tips for the East Bay cover how to plan around timing gaps like this.


What Else Should You Check Before Buying New Construction in Dublin?

Check the inspection process, the development around your lot, and your own paper trail. A new home is not automatically a finished or defect-free one, and the surrounding community may still be under construction when you move in.


Should you hire an independent inspector on a new build?

Yes, I recommend it. The city's inspections are part of the permit process, and a buyer's inspection serves a different purpose: it gives you your own set of eyes on the home. Ask whether the builder allows an independent inspection before drywall, a pre-delivery inspection, and a final inspection before closing.


Also request the builder's written procedure for documenting incomplete or defective work. Make sure you understand which items are handled through the builder's warranty after closing and how you'd submit a claim.


What should you ask about the development itself?

Ask about the community, not only the house. These details come from the HOA documents and the builder's project disclosures:

  • Is the community subject to an HOA, and when do assessments or maintenance obligations begin?

  • What amenities and common areas are planned, and are they built yet?

  • Are future phases still under construction, and how will construction traffic be managed?

  • Who is responsible for utility activation, solar or battery equipment, drainage, retaining walls, grading, landscaping, fencing, and post-construction settlement repairs?


In a phased East Bay development, your home can be complete while nearby streets, parks, landscaping, or neighboring buildings are not. That's worth knowing before you commit, not after.


Can you negotiate, and do incentives come with strings?

Sometimes, but terms vary by builder and by community. Price, upgrade credits, and incentives are all things to ask about, and any incentive should be read in full. Ask specifically whether an incentive is tied to using the builder's preferred lender or title company, what happens to it if you choose your own, and how it's reflected in the contract. I'll help you compare an incentive against the terms you could get on your own before you decide.


How should you document everything?

Keep a dated file. Save the base specification, option list, price sheet, floor plan, incentive terms, estimated completion date, your upgrade selections, and every revision. Match each feature to the written specification for your selected lot and plan. If the sales office says it, ask for it in an email or an addendum.

Before signing, review the purchase agreement, every addendum, the option sheets, and the HOA documents. Your closing agent handles escrow and the settlement of funds, but they won't negotiate the builder's terms for you. Having an agent in your corner before you register with the builder matters too, since registration policies vary by community. For a broader look at the area, see my guide to buying new construction homes in Dublin, CA.


FAQ

What is included in the base price of a new-construction home in Dublin?

It depends on the builder, plan, and lot, so the answer is whatever the written inclusion sheet says. Ask for it before you compare homes, and check flooring, countertops, cabinets, appliances, lighting, fencing, landscaping, and garage equipment line by line. Anything you saw in the model that isn't on the sheet should be treated as an upgrade.


How much should I budget for builder upgrades in Dublin?

There's no reliable local upgrade schedule, because pricing varies by builder, plan, phase, and whether an option is structural or cosmetic. Use the builder's dated design-center price sheet for your community rather than an online estimate. I'd rather run your specific selections with you in a consultation than give you a number that doesn't fit your home.


When do I choose structural options, cabinets, flooring, lighting, and appliances?

Structural options usually come first, since they affect plans and construction sequencing and often must be chosen before framing or rough plumbing. Cosmetic selections like cabinets, flooring, and lighting typically come later, but they can still become unavailable once materials are ordered. Ask the builder for a written deadline list for your lot.


Should I hire an independent home inspector for a new-construction home?

Yes, I recommend it. City inspections are part of the permit process, but a buyer's own inspector gives you an independent view of the home. Ask the builder whether it allows inspections before drywall, at pre-delivery, and before closing, and request its written procedure for documenting incomplete or defective work.


What should I review before signing a new-construction purchase agreement in California?

Review the full agreement along with every addendum, the option sheets, the inclusion sheet, the incentive terms, and the HOA documents. Look for language on deposits, cancellation, delay remedies, change orders, and warranty procedures. Because these terms aren't uniform from one builder to the next, I read them with my buyers before they sign.


Get the Checklist Answered Before You Commit

Buying New Construction in Dublin goes well when the builder's promises are in writing and the dates are checkable. If you're weighing a specific community, I'll help you build the inclusion comparison, read the contract terms, and ask the right questions before you sign. Schedule a free consultation and bring the builder's paperwork. If you also own a home you'll need to sell first, you can get a home valuation to plan the timing.


About Tracy Tang Team

Tracy Tang (DRE #01956297) is a top-producing REALTOR® and team leader of the Tracy Tang Team at Compass, serving the San Francisco Bay Area with a focus on the East Bay. Licensed since 2014, she has 11 years of experience and over 140 homes sold, specializing in luxury homes, relocation, move-up buyers, 1031 exchanges, multi-family properties, new construction, and off-market deals. Tracy has over 120 verified client reviews across Google, Zillow, and Yelp and is a member of the Tom Ferry coaching network.

Compass · (415) 828-2961


Equal Housing Opportunity. Tracy Tang, DRE #01956297, Compass. Regulated by the California Department of Real Estate (DRE). This article is general information, not legal, tax, or financial advice; confirm your own numbers and terms with your closing agent, tax advisor, or lender.

Comments


Get Informed! Stay Ahead of the Market!

Terms of Service  |   Private Policy

Contact

​

TRACY TANG HOMES, COMPASS Real Estate
760 Camino Ramon Suite, 200,

Danville, CA 94526, United States
O: (925) 856-5698
M: (415) 828-2961
E: Tracy@tracytanghomes.com
CA DRE Lic# 01956297

  • Instagram
  • Facebook
  • LinkedIn
  • YouTube
  • TikTok
  • Yelp!
  • zillow-logo-739BA794BF-seeklogo.com_

© 2025 by Tracy Tang Homes. 

bottom of page